Client: Laxton Properties Ltd

Location: Aston Clinton
Dates: August 2019 & January 2020
Section 278 Works

As part of the Church Green development in Aston Clinton we undertook  section 278 works to improve the layout and safety to London Road and Church Lane. This has improved safety for the local primary school and all local residents;

  • Zebra crossing with Belisha beacons installed on London Road adjacent to Aston Clinton School
  • High visibility guardrail positioned
  • Removed and resurfaced tarmac to London Road and Church Lane
  • Constructed new 2m wide footpath to Church Lane
  • Increased London Road footpath to 2m
  • Re-positioned existing street lighting on London Road with new columns and heads installed
  • New lighting installed on Church Lane and London Road
  • Worked closely with highways under road closure agreement
  • New drainage installed
  • Conservation kerbs installed along footpaths
  • Street name signs replaced
  • New road signage installed as well as old signs replaced
  • Raised new and existing ironwork’s to required level for surfacing works
  • Green areas landscaped
  • View Our Residential Development ServicesView Our Residential Development Services

    Leave a Reply